Summary from the previous week. I had a very productive week excedding all the goals from last week.
Painting Progress
Finished 3 Everblight Shredders
Finished the 2nd Cyclops in full NMM
Got the base coat down on the 4th Shredder
Assembly progress
Assembled the Dire Troll Mauler
Assembled the Titan Cannoner
Assembled the Seraph
Assembled 6 Preatorians.
Assembled 2 Shredders
I picked up the Preatorians on Friday afternoon and now that I've got them in hands I'm quite happy with them, but at the same time there was no point which I hated the models in the first place so maybe that doesn't say much. Models come in 4 parts.
Preator
Main body
Left arm and Should Pad
Right Arm
Shoulder Pad
Dakar
Main Body
Left Arm and Should Pad
Head
Banner
Models went together pretty well. I ended up pinning almost every piece, with the exception of the individual Shoulder Pads. Details on the miniature came through nicely.
Next week's Goals:
This week is going to be pretty busy. Heading out of town Friday morning and won't be back until Monday nigh, mix that with class Thursday night and meeting friends tonight I'm lookng at roughly 1.5 nights available for painting. So I'll take care of either 1 Shredder or Llylth this week. Depending on time I may get all the assembled work primed for later use.
Painting Progress
Finished 3 Everblight Shredders
Finished the 2nd Cyclops in full NMM
Got the base coat down on the 4th Shredder
Assembly progress
Assembled the Dire Troll Mauler
Assembled the Titan Cannoner
Assembled the Seraph
Assembled 6 Preatorians.
Assembled 2 Shredders
I picked up the Preatorians on Friday afternoon and now that I've got them in hands I'm quite happy with them, but at the same time there was no point which I hated the models in the first place so maybe that doesn't say much. Models come in 4 parts.
Preator
Main body
Left arm and Should Pad
Right Arm
Shoulder Pad
Dakar
Main Body
Left Arm and Should Pad
Head
Banner
Models went together pretty well. I ended up pinning almost every piece, with the exception of the individual Shoulder Pads. Details on the miniature came through nicely.
Next week's Goals:
This week is going to be pretty busy. Heading out of town Friday morning and won't be back until Monday nigh, mix that with class Thursday night and meeting friends tonight I'm lookng at roughly 1.5 nights available for painting. So I'll take care of either 1 Shredder or Llylth this week. Depending on time I may get all the assembled work primed for later use.